Use of RamsetReid Precast solution including Lifting anchors, clutches and cast-in anchors to deal with the one of the biggest and signature project in Hong Kong.
Submitted by:
Ramset Fasteners (HK) Limited - James Ho
Name of Project | Kai Tak Sports Park | ||
Exact location of project | Kai Tak Sports Park, a world-class sports infrastructure in Hong Kong which covers around 28 hectares, a new 50,000-seat main stadium with a retractable roof for public enjoyment. It also features a variety of facilities such as outdoor ball courts, open lawn areas, children's play areas, fitness stations and more.
The Kai Tak Sports Park is the most important investment of the Government in sports infrastructure in recent decades. Occupying 28 hectares of land, the Kai Tak Sports Park is about 9 hectares larger than the Victoria Park and will contribute significantly to sports development of Hong Kong. A Main Stadium with a fixed seating capacity of 50,000, with the theme "Pearl of the Orient" as its design inspiration, it boasts a retractable roof and flexible pitch surface that can host a wide range of international, regional and local events in any weather. A Public Sports Ground with a seating capacity of 5,000, suitable for hosting school sports days, athletics meets, local football and rugby matches, as well as team and athlete training sessions. With the exception of major events, the Public Sports Ground will be open daily to the public for jogging and quali-walk free of charge. Exact location and details are given in the link below: |
||
Start date | The site started in 2019 products are purchased start from late 2020 |
||
Finish Date | 2023 |
Overview: What is this case study and why have you selected it.
The focus of this case study is how Ramset product could suit for the needs in this one of the biggest construction project in HK with our precast solutions.
Project overview
Main Stadium
Main Stadium
Indoor Sports Centre
Public Sports Ground
The main stadium will be built by concrete precast. The shape of the precast would look like staircase, while the 50,000 seats will be installed on top of the staircase and the E&M services will be installed under the staircase. To match with the tight construction schedule, cast-in anchors will be casted in the precast factory in mainland for the E&M fixing on-situ. Also to meet the flexibility requirement, cast-in anchors will be used for the seat fixing. The entire precast unit will be lifted by Ramset Reid Lifting system with lifting anchors and lifting clutches.
RamsetReid lifting system has provided outstanding benefits over the traditional lifting listed below:
- Test report on tensile strength test are provided, and annually renewal on the test report to fulfil HKHA requirement.
- In-house tensile strength test for each batch of production to ensure RamsetReid product in good condition and quality.
- RamsetReid special design clutch is paired up with RamsetReid Lifting anchors to ensure safe lifting on site. The clutches conducted non-destructively proof tested to 2 times the safe working load prior to leaving the factory.
- Calculation and design services on lifting are provided to customer for choosing right lifting solution which suit for the Precast CoP with FOS = 4.
- Wide range of different loading capacity and application lifting anchors to suit for varied site conditions such as foot anchor for slab and staircase, eye anchor for thin panel, edge lift anchor for tilt up, etc.
- Proved record on safety and wide range of job reference from HKHA, ASD, and private residential development.
RamsetReid Cast-in Anchor is one of the best solution in precast segment:
- No post-drill is required on site so that no risk on clashing with reinforcement or damage to concrete substrate.
- No on-site post-drill means dust-free which is environmental friendly.
- Minimized edge and spacing distance comparing with post-drill anchors.
- Shorter embedment depth is required for cast-in anchors.
- Fast on-site installation by simply bolt and nut.
- Lower in cost comparing with Cast-in Channel.
- On the Building Department Central Data Bank List which is easy for BD approval.
- Applicable to cracked and non-crack concrete.
Detail who the key players are (If known) List company name, responsibility, contact, position and their involvement if applicable. "Other" maybe the asset owner, tenant, etc.
Client | Kai Tak Sports Park Ltd |
Architect and Consultant / Specifier | Populous - in terms of Architect design |
Sportfive - in terms of Sports Venue design | |
Arup - in terms of Structural design | |
Contractor (Design and Build) |
Hip Hing Engineering |
Subcontractor | Young's Engineering Co., Ltd. - E&M contractor |
Redland Precast Concrete Products (China) Ltd - Precast Supplier |